EP PROJECT took part in the project to reconstruct the district heating network on the street. Casimir the Great. The design team faced the challenge of designing the replacement of a 2xDN500 duct network with a pre-insulated one in downtown Wroclaw. Despite a number of industry and field arrangements, the work proceeded without delay and on schedule.